Type | High Pressure Common Rail Injector Solenoid Valve |
Part Number | F00RJ00395 |
Quality | China Made New |
SKU | L21B2F00RJ00395 |
Net Weight | 0.08kg |
Size | 6cm* 3cm *3cm |
MOQ | 1pcs |
WE GIVE YOU MORE
Lorem ipsum dolor sit amet, consectetur adipiscing elit。Ut elit tellus、luctus nec ullamcorper mattis、pulvinar dapibus leo。
Lorem ipsum dolor sit amet, consectetur adipiscing elit。Ut elit tellus、luctus nec ullamcorper mattis、pulvinar dapibus leo。
Owners Manuals
Lorem ipsum dolor sit amet, consectetur adipiscing elit.Utelit tellus,luctus nec ullamcorper mattis,pulvinar dapibus leo.
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Utelit tellus, luctus nec ullamcorper mattis,pulvinar dapibus leo.
1. F00RJ00395 Injector Solenoid Valve Introduction
1.1. F00RJ00395 Injector Solenoid Valve Basic Information
Title | F00RJ00395 Injector Solenoid Valve 0445120 Series China Made New |
SKU | L21B2F00RJ00395 |
1.2. F00RJ00395 Injector Solenoid Valve Common Part Number
- Injector Solenoid Valve Applicable Injector Model
Injector Part Number | Injector Part Number | Injector Part Number | Injector Part Number |
0445120002 | 0445120011 | 0445120033 | 0445120034 |
0445120051 | 0445120052 | 0445120096 | 0445120108 |
0445120173 | 0445120174 | 0445120175 | 0445120176 |
- Injector Solenoid Valve Matching Information
Vehicle brand | Car Model | Engine Model | OE Number |
For CITROEN | Jumper 2.8 HDI | 8140.43S | 1980 83 |
For FIAT | Ducato 11 2.3 JTD | F1AE0481C | 500371101 |
For VOLVO PENTA | / | / | 3803634 |
For VOLVO PENTA | / | / | 3803908 |
For VOLVO PENTA | / | / | 3819193 |
For VOLVO PENTA | / | / | 3801148 |
For VOLVO PENTA | / | / | 21188520 |
For VOLVO PENTA | / | / | 3801295 |
1.3. F00RJ00395 Injector Solenoid Valve Parameters
Injector Solenoid Valve Adaptation System: Common Rail System
Injector Solenoid Valve Series: 120 series CRIN1-14/16
Injector Solenoid Valve Type: Solenoid Type
Injector Solenoid Valve Size: 6cm* 3cm *3cm
Single Injector Solenoid Valve Weight: 80g
Injector Solenoid Valve With Packaging Weight: 100g
Injector Solenoid Valve Quality: China Made New
Injector Solenoid Valve Packaging Size: 7cm* 5cm *5cm
Injector Solenoid Valve Type: High Pressure Common Rail Injector Solenoid Valve
Injector Solenoid Valve Minimum Order Quantity: 1 piece
2. F00RJ00395 Injector Solenoid Valve Customization Service
- Injector Solenoid Valve Customization Service Coverage: Meet OEM manufacturers’ customization needs for shell engraving, logo engraving, injector solenoid valve internal packaging, injector solenoid valve external packaging and labels, etc.
- Injector Solenoid Valve Customization Service Requirements:
The purchase quantity of customized injector solenoid valve is not less than 10 pieces.
The purchase quantity of customized injector solenoid valve boxes is not less than 1000 pieces.
When the customized products involve the need of specify logo, the OEM manufacturer is asked to provide trademark authorization and the sample of logo image file.
Once the customized injector solenoid valve is sold, it can’t be returned or exchanged if there is no quality problems.
3. F00RJ00395 Injector Solenoid Valve Delivery
3.1. F00RJ00395 Injector Solenoid Valve Lead Time
Lead Time: Send out within 3 – 7 working days after receiving payment (Except for special products and special cases).
3.2. F00RJ00395 Injector Solenoid Valve Logistics Time for Destination Out of China’s Areas
DHL Logistics Time:
Country or Region of Departure | Hong Kong, China | Other Countries or Regions of Asia | Australia and New Zealand | Europe | America | Other Countries |
China’s Mainland | 7 Days | 7 Days | 8 Days | 8 Days | 8-12 Days | 7-10 Days |
UPS Logistics Time: Country or Region of Departure: China’s Mainland
Country of Destination | Estimated Arrival Time | Country of Destination | Estimated Arrival Time | Country of Destination | Estimated Arrival Time |
Japan | 3 Days | UK | 5-7 Days | Egypt | 5-7 Days |
Turkey | 5-7 Days | Singapore | 3 Days | Switzerland | 5-7 Days |
Bahrain | 5-7 Days | Latvia | 7-10 Days | New Zealand | 7-10 Days |
Sri Lanka | 5-7 Days | Thailand | 3 Days | Austria | 5-7 Days |
Romania | 5-7 Days | Vietnam | 3-5 Days | Estonia | 5-7 Days |
Malaysia | 3-5 Days | Israel | 5-7 Days | Mexico | 7-10 Days |
France | 5-7 Days | America | 5-7 Days | United Arab Emirates | 5-7 Days |
Italy | 5-7 Days | Netherlands | 5-7 Days | Bengal | 7-10 Days |
Lebanon | 5-7 Days | Philippine | 3-5 Days | Greece | 7-10 Days |
South Korea | 3 Days | Spain | 5-7 Days | Myanmar | 5-7 Days |
Canada | 5-7 Days | Germany | 5-7 Days | Saudi Arabia | 7-10 Days |
Portugal | 5-7 Days | Australia | 5-7 Days | South Africa | 7-10 Days |
Denmark | 5-7 Days | Belgium | 5-7 Days | Ukraine | 7-10 Days |
India | 7-10 Days | Qatar | 7-10 Days | Poland | 5-7 Days |
Indonesia | 3-5 Days | Morocco | 7-10 Days | Pakistan | 7-10 Days |
Kuwait | 7-10 Days | / | / | / | / |
The logistics time is for reference only, subjects are according to the actual arrival.